Subsea tie-back installation support

Installation engineering, vessel interface management, and commissioning oversight for a 12km subsea tie-back to an existing host platform.

Subsea tie-back installation support

Project overview

Milner Offshore provided installation engineering and offshore construction management support for a 12km subsea tie-back connecting a new subsea development to an existing host platform.

The scope included detailed installation engineering, preparation of lifting and rigging plans, vessel interface coordination, and oversight of pipe-lay, umbilical installation, and subsea equipment hook-up activities.

Our team maintained presence offshore throughout the installation campaign, managing interfaces between the installation contractor, equipment vendors, and the operator's project team. The tie-back was commissioned on schedule, achieving first oil within the target window.

Scope of work

  • Installation engineering and method statement development
  • Vessel selection and marine operations planning
  • Subsea equipment interface management (trees, manifolds, jumpers)
  • Umbilical, riser, and flowline (URF) installation oversight
  • Pre-commissioning and commissioning support
  • As-built documentation and handover to operations